Summary

ACG are assisting Miedecke Motor Group as the Project Management team to manage the design and construct of the Alterations to Ford Showroom building. This entail collaborating all key stakeholders from Council, Architects, Structural Engineers to Certifiers, builders and ultimately the client.

Scope of Works

    • Collaborate with all Key Stakeholders
    • Manage stakeholders and drive results to ensure budget and timeframes are met.
    • Prepare and finalise engineering documents for subdivision construction certificate
    • Undertake due diligence of Contractor capacity and capabilities and award contract to preferred Civil

Contractor

Acts as Principal’s representative under the contract and manage civil construction works

PROJECTS

ACG were awarded the contract to undertake much needed urgent road rehabilitation works due to landslides. The works were completed in steep conditions while the ground surface materials were still at times wet or holding moisture.
This design and construct work required careful thought prior construction; taking into consideration the existing ground conditions and natural fall of the ground and water in rain fall events to capture and divert water without the need for major excavations that would be costly to the client.
Works will be conducted to MidCoast Council specifications with all hold and witness points being adhered to. ACG liaise with the consultant and the Councils Engineer or Authorised Representative to ensure the project is complete to standard and with co-operation of all parties involved.